Idea for Mirror Pond

Pacific Power owns the dam that creates a small but profitable return of energy for this facility. The dam is also the cause of the Mirror Pond build-up. The cost to remove the dam and restore its construction area would be significant to Pacific Power. Why not leave things as they are and Pacific Power pays the cost of dredging the river every 10 or 15 years as the silt builds up.

Harold Anderson
Bend

Source: The Bulletin ©2013

Leave a Reply

Your email address will not be published. Required fields are marked *