Option C2: Sediment Re-use on Site then Dam Removal

C2 Dam Removal: If the dam is removed in Option C1, this is a possible outcome. After the dam is removed existing water levels drop and flow into original channel.

Option C2

General Description: After partially dredging Mirror Pond and re-using the sediment on site, the dam is removed. When the dam is removed, the existing shallow waters retreat to the original channel. New lawn areas next to public park lands remain. The emergent zones and riparian shrub zones are re-graded to meet the new channel and require additional plantings for these zones.

Option C2 - Views