In 1984 the City dredged the Pond. At that time, the project engineer predicted that unless changes were made in the management of upstream flow, the Pond would again require dredging in about 20 years. In reality, sedimentation was already an issue by 1991 according to local media reports and public filings.
Leave a Reply